Customization: | Available |
---|---|
Usage: | Chemical Industry, Feed, Food Industry |
Screw Conveyor: | Screw Feeder |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Main Features:
1: Power Supply: 3 Phase 208-415V 50-60Hz
2:Charging angle: Standard 45 degree, 30~60 degree are also available.
3:Charging Height: Standard 1.85 meters,1 - 5 M could be designed manufactured
4: Hopper Volume 200L as standard and 50-500L can be optional
5 The Hopper Can fix the stirring (optional)
6 The screw conveyor can fix the lid
7 The screw Auger is full welding polish.
Remark:Other Charging Capacity could be designed and manufactured.
Main Technical Date
Model |
DH-S2-2K |
DH-S2-3K |
DH-S2-5K |
DH-S2-7K |
DH-S2-8K |
DH-S2-12K |
Charging Capacity |
2m3/h |
3m3/h |
5 m3/h |
7 m3/h |
8 m3/h |
12 m3/h |
Diameter of pipe |
φ102 |
φ114 |
φ141 |
φ159 |
Φ168 |
Φ219 |
Total power |
0.58KW |
0.78W |
1.53KW |
1.53KW |
3.03KW |
4.03KW |
Total Weight |
100kg |
130kg |
170kg |
200kg |
220kg |
270kg |
Hopper Volume |
100L |
200L |
200L |
200L |
200L |
200L |
Frequently asked questions:
Q1:Are you factory or trading company?
A: We are factory located in shanghai china with 20 years manufacturing experience.
Q2: What machines you can make?
A: Auger filler, screw and vacuum feeder, Ribbon and paddle mixer, Vertical form fill and seal powder packaging machine, Complete Powder bottling/canning Production line etc.
Q3: Can i visit your factory and send our team for training before order delivery?
A: Yes, sure! Welcome to visit us and get a training or make FAT!
Q4: What's your warranty and after-sale service?
A: One year warranty against shipping date ,our engineer can be at your site for commissioning and installation or via whatsapp/skype/wechat to provide remote technical support.
Q5 : What is the payment term?
A: 30% T/T deposit and 70% T/T before delivery or you can come to inspect the machines before delivery then make final payment!
Q6:How long is the delivery time?
A: Single machines order 20-40days, Production line order 60-90days.